Monday, April 7, 2008

Final Parti Drawings: CIRCULATION





I decided to highlight the vertical walls of the various hallways within the plans so as to reveal the circulation throughout the building. Further, I doubled the lines where the entry to the building is on level 1 as well as thickening and darkening the lines around the central stairwell on level 2 due to this being key to the buildings circulation.

No comments: